Project deployment in Regensdorf (Switzerland)

We deployed our bending technology in Regensdorf near Zurich over a period of 17 days. During this time, a total of 84 pipes were successfully bent and prepared for further installation. DN450 pipes with an outer diameter of 670 mm and a wall thickness of 6.3 mm were used. The bends ranged from 6° to 29° – a range that demonstrates how flexibly our machine can respond to the varying requirements of a construction site.

Thanks to the mobile technology, the work could be carried out directly on site, which minimized transport costs and simplified the processes for everyone involved.

Brief overview

  • 84 bend pipes
  • 6° minimum angle
  • 29° maximum angle
  • 17 deployment days

Galery