We use cookies and comparable technologies. Technically necessary cookies are required to operate this website. In addition, we would like to collect anonymised usage statistics with Google Analytics in order to improve our services. This involves transferring data to Google, including to the USA. Your consent is voluntary and can be withdrawn at any time with effect for the future.
Over a period of 10 bending days, a total of 56 pipes were processed. Since the order covered several different sections of the route, completion took a longer period of time.
Among other things, this project also involved bending an S-bend with 8.1° per side, which impressively demonstrates the precision and flexibility of our technology.
The bending angles for this order ranged from 3.98° to 16.4°, ensuring that all pipes met the specified requirements of the route exactly.